Non-Compliance detail


  
Summary
 
Licence number: 832
Annual Return Start: 01 Feb 2010
Annual Return End: 30 Jun 2010
Date Received: 01 Sep 2010
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L2.2 Load limit exceeded for Total Phosphorus (Monitoring Pt 1) due to variable performance of hydroponic wetland & unrealistic load limit specified. Upcoming monitoring & performance assessment will determine suitable concentration limits. EPA to monitor future compliance with this condition 1
L4.1 Volume limit exceeded - 4 occasions - Monitoring Pt 1 due to extended period of wet weather & large storm events causing high rates of inflow & infiltration into sewage system. All high flows received primary treatment & detention prior to discharge. Appropriate Action taken by licensee 4
L3.3 Concentration limits exceeded for Total P - 5 occasions at Monitoring Pt 1 due to variable performance of hydroponic wetland & unrealistic 100%ile limit. Upcoming monitoring & performance assessment will determine suitable concentration limits. EPA to monitor future compliance with this condition 5